Shotley Peninsula Cycling Campaign

 
  Home - News and Projects - Events and Meetings - Schools - Contacts and Membership - About Us - Links - Merchandise  
 

News and Projects

 

Newsletters
2010

Jul

Nov

 
2011

Feb

Mar

Oct

 
2012

Feb

May

Response to Planning Application for Ganges

Aug

Nov

2013

Mar

Aug

Dec

2014

Apr

Aug

Dec

2015

Sept

Dec

2016

Sept

Dec

Projects

Our priority project, now known as the Shotley Peninsula Green Way (a "community path") is to create a new, largely traffic-free, path from Ipswich down to Shotley Gate, suitable for cyclists, walkers and wheelchair users.  In due course we also want to create a link from this path southwards into Holbrook and Alton Water.

In 2011 we raised enough money to commission Suffolk County Council to carry out a feasability study into this project. We received generous grants from virtually all the Parish Councils along the route, and several other local organisations (see list below).  We published the study for discussion and consultation later that year. It contained a draft route for the community path, together with phasing, costing and funding proposals.

 

Proposed Community Path from Ipswich to Shotley Gate (now called the Shotley Peninsula Green Way)

The study’s main proposals are

  • A new, largely traffic-free, community path from the edge of Ipswich down to Shotley Gate
  • Preferred route but with alternative routes over several sections
  • About 7.5 miles on new surfaced cycle/footpath
  • Proposed first section : Bourne Bridge to the Freston Boot PH
  • The route comprises a mix of new path, bridleways, upgraded existing paths and a few on-road sections where no alternative exists

The full report, with maps, can be viewed here Appendix B work schedule

Maps for the individual sections can also be viewed using the links below:-

A1-1 Ipswich - Freston, A1-2 Freston - Woolverstone, A1-3 Woolverstone - Chelmondiston,

A1-4 Woolverstone (alternative route), A1-5 Chelmondiston, A1-6 Chelmondiston - Shotley (Street) ,

A1-7 Chelmondiston - Arwarton (alternative route), A1-8 Shotley (Street), A1-9 Shotley (Gate)

These are best viewed using Adobe Acrobat if possible.

Since publishing this feasability study and draft route in 2011, and following consultations and discussions, it has become apparent that some changes will be needed. This will normally be to secure landowner agreement or address conservation issues. We will be working out the detailed, final, route as we deal with each section of the path in turn and after securing agreement from the affected landowners.

Initially we are concentrating on the Bourne Bridge to Freston Boot and the Shotley Street to Shotley Gate (foot ferry) sections. As each section is progressed there will be further public consultation which will, in most instances, include the submission of a planning application. However if you wish to know what the latest thinking is on the proposed alignment of any section of the path, then do contact a member of our committee (see "Contacts & Membership")

A pictorial view of the proposed route for the path between Erwarton Walk and Shotley Gate can be viewed via Flickr using the icon link below. Please use the "show info" link on Flickr to get description and information on "map points".

Erwarton Walk to Shotley Gate section

 

 

Bourne Bridge to Freston section

Some photos of this initial proposed route are also available on Flickr using the icon link below.

CYCLING SURVEY

In order to collect the information we need about the demand for a safe cycle path network on the Shotley Peninsula we conducted 8 days of traffic and cycle surveys on the B1456 in August and September 2011. These included a count of those cycling along this road as well as all the different types of vehicles using it. These survey results and conclusions can be seen on the links below. The SPCC Committee would like to thank all those (over 20) who volunteered to help out with these surveys.

 

Traffic Survey Summer 2011 (Spreadsheet) Traffic Survey Conclusions

Please e-mail webmaster@spcc.info for any issues in viewing these files.

Also in 2011 we completed a cycling habit survey by asking people to complete a questionnaire. A total of 309 completed questionnaires were returned, 215 from the general public and 94 from Holbrook High School students

These results have now been collected and analysed and they are available to view in the pdf document below.

Cycle survey questionnaire results 2011

 

SUSTRANS RESEARCH

Armed with these survey results we have also commissioned Sustrans, the country's leading cycling charity, to prepare a report estimating how much annual cycling there is on the B.1456 now (2011) and how much this is likely to increase following the introduction of our planned traffic-free community path. Based on similar case studies from other parts of the country Sustrans' conclusion is that the amount of cycling along the B.1456 corridor is likely to double following the construction of this new path. The full report can be viewed here.

Sustrans Report - January 2012


Full list of grant providers:

Babergh District Council
Babergh East Local Strategic Partnership
County Councilor David Wood
East of England Co-operative Society
Ipswich High School for Girls
The Parish Councils of Chelmondiston, Freston, Holbrook, Shotley, Woolverstone
Suffolk Foundation (Greenest County Fund)

 

This website was designed and created by Estelle, Maddie and Freya from Ipswich High School